High earthquake protection of Beznau NPP confirmed

The Swiss Federal Nuclear Safety Inspectorate ENSI has published its report on the assembly deviation on two of six emergency diesel generators at the Beznau nuclear power plant (KKB). ENSI concludes that KKB was safe and protected against earthquakes despite the assembly deviation.

As a consequence of Fukushima, ENSI increased the earthquake protection requirements for all Swiss nuclear power plants in 2012. At that time, KKB provided the necessary verifications with a positive result. In 2020, however, the assembly deviations on the emergency diesels were discovered. As a result, it only became clear in retrospect that the formal requirements had not been fully met in the event of an earthquake, which is to be expected only once every 10,000 years. This resulted in a formal deviation during two months (April and May 2012). With the commissioning of two retrofitted diesel generators in June 2012, the requirements were met again according to the authority.

Thanks to various retrofits and other measures, ENSI certifies that the KKB has a very high level of earthquake safety. Over the past decades, Axpo has invested around CHF 2.5 billion in the reliability and safety of the plant. During the months of April and May 2012, the level of earthquake protection was the same as in the months and years before.

In the meantime, KKB has analysed the reasons for the non-detection of the assembly deviation and various measures are being implemented. For example, additional checks are being carried out on ongoing projects to determine whether the components supplied correspond to the design. In addition, existing processes are being analysed and adjusted if necessary.

Axpo Holding AG

Corporate Communications

medien@axpo.com

T 0800 44 11 00 (Schweiz) 
T +41 56 200 41 10 (International)

(08.00 - 17.30)

More media releases

Show all

International business 02.12.2024

Axpo and Hydro sign long-term contract

Hydro Energi and Axpo Nordic have signed a ten-year contract to supply 2.63 terawatt hours (TWh) of electricity to Hydro. Under the long-term contract, from 2026 to 2035 Axpo will deliver electricity to Hydro in Swedish price area SE2.

Read more

International business 26.11.2024

Axpo and Stegra sign 2 TWh electricity deal

Axpo Nordic and Stegra have signed a power purchase agreement (PPA) for the supply of electricity to Stegra’s integrated green hydrogen, green iron and green steel production plant in Boden, Sweden, it was announced today.

Read more

Renewable energy 20.11.2024

Axpo awarded 163 MW in French green energy tender

Axpo’s solar and wind divisions have successfully secured a combined capacity of 163 megawatts (MW) in two recent public tenders organised by the French government, it was announced today. The results reinforce Axpo’s position as a leading international producer of renewable energies, making a significant contribution to the expansion of climate-friendly electricity generation in Europe.

Read more