Beznau nuclear power plant: Start of refueling in Unit 2

4.8.2020 - Unit 2 of the Beznau nuclear power plant (KKB) was taken off grid today, Tuesday, as planned in order to carry out refuelling. After reactor reloading, the plant will be ready for the next operating cycle.

The shutdown of Unit 2 marks the end of the production cycle that began on 20 September 2019. Since then, KKB 2 reliably produced about 2.9 billion kilowatt hours of electricity without interruption. This correspondsto the annual power consumption of about 600,000 households in Switzerland.

During the shutdown that will last about two weeks, 20 of the 121 fuel elements will be replaced and installedin the reactor core. In addition, recurring inspection work and integral system tests will be performed.

During the shutdown, steam from the non-nuclear section will be visible above the powerhouse. This does not pose any danger to human beings or the environment.

During refuelling, the approx. 460 KKB employees will be supported by some 120 external experts.

The measures instituted in spring to prevent the spread of the corona-virus and to protect internal and external staff will continue to be closely observed.

Refuelling work is supervised by the Federal Nuclear Safety Inspectorate ENSI.

 

Additional information

Axpo Holding AG, Corporate Communications 

T 0800 44 11 00 (Switzerland) | T +41 56 200 41 10 (international), medien@axpo.com

Axpo Holding AG

Corporate Communications

medien@axpo.com

T 0800 44 11 00 (Schweiz) 
T +41 56 200 41 10 (International)

(08.00 - 17.30)

More media releases

Show all

Grids 26.03.2025

Start of construction of underground cabling from Langacher to Sins (Canton Zug)

To ensure the future energy supply, Axpo is increasing the operating voltage of its power lines in the Canton Zug from 50 to 110 kilovolts (kV). This will increase transmission capacities and reduce transmission losses. As part of this project, the existing line between the Langacher and Sins substations will be laid in the ground. Construction work will start at the end of March 2025.

Read more

Wind power 20.03.2025

Axpo in dialogue with local communities on potential wind farm at Dreibündenstein

Switzerland needs more renewable energy, particularly in winter. Axpo is therefore initiating preliminary assessments for a potential wind farm in the Dreibündenstein area, in the canton of Graubünden, it was announced today. To this end, Axpo engaged with the local population through two information events. The next steps include feasibility assessments and wind measurements, with a wind measurement mast set to be installed in the coming months.

Read more

Renewable energy 19.03.2025

KSL: More electricity produced once again

At their Annual General Meeting, the shareholders of Kraftwerke Sarganserland AG (KSL) approved the annual financial statements and report for the 2023/24 financial year. Electricity production in the reporting year was significantly higher than the already strong previous year and also above the long-term average.

Read more