Limmern PSP awarded for recultivation

09.09.21 - During the construction of the Limmern pumped storage plant (canton of Glarus), Axpo was responsible for one of Switzerland’s largest building sites, between Tierfehd and Muttenalp. But today there is barely a trace of it to be seen. It’s all thanks to a specialist recultivation project conducted over a number of years, which has now been recognised by the Swiss Association for Engineering Biology. 

The Swiss Association for Engineering Biology awarded its ‘Greener Prize 2021’ to the recultivation project around the Limmern pumped storage plant ‘for the outstanding work before the actual greening and the flawless execution of the work, for the positive cooperation with the authorities and environmental associations, and for raising awareness among the construction companies’.

Around 600 people and countless pieces of heavy machinery were deployed in the construction of the Limmern pumped storage plant between 2009 and 2016, along with two construction cableways. It was already apparent in the planning stage that the construction site and the cableways would place a strain on the environmentally valuable terrain. The builders coordinated the technical possibilities and the definitive recultivation concept with the environmental working group assigned to the project and with the authorities. The stated objective was to ensure that any interventions in the landscape and habitats would be invisible in the medium term.

Test garden 2,500 metres above sea level

Even during the construction phase, specialists commissioned by Axpo were carrying out greening experiments. They collected and propagated seed and plant material in the construction site area at various altitudes. To assess the various greening methods, the resulting plants were planted in a test garden in the Muttsee area. A total of 2,000 seedlings were planted and observed in 25 trial areas. 

For the final recultivation, additional local seed material was collected and propagated to ensure that enough seeds and plants would be available when the demolition work began. And now large parts of the construction area have already returned to nature. Where there was once a construction site and construction cableway, most of the original vegetation has returned.

You can find detailed information about the project in Ingenieurbiologie magazine.

Axpo Holding AG

Corporate Communications

medien@axpo.com

T 0800 44 11 00 (Schweiz) 
T +41 56 200 41 10 (International)

(08.00 - 17.30)

More media releases

Show all

Company 21.09.2015

Board of Directors nominates Thomas Sieber as new Chairman

The Glarner Thomas Sieber (53), Chairman of Salt Mobile SA, is expected to be appointed as the new Chairman of the Board of Axpo Holding AG at the Annual General Meeting on 11 March 2016. The Axpo Holding AG Board of Directors decided unanimously to put this motion before the General Annual Meeting. Sieber will succeed Robert Lombardini (66), who is retiring and has been Chairman since 2004.

Read more

Company 15.06.2015

Low wholesale prices for electricity weigh on first-half profits – cost-cutting measures taking effect

Despite pleasing progress in implementing its strategy to optimise its core business, reduce costs and open up new sources of revenue, Axpo Holding AG reports a decline in key below-the-line figures for the first half of the 2014/2015 financial year. Persistently low wholesale electricity prices are the main reason for this.

Read more

Company 14.09.2015

Weak euro and low electricity prices force Axpo to make further value adjustments

The market environment remains extremely challenging for energy companies: in addition to the persistently low wholesale prices for electricity on the European market, the currency effect is now also generating considerable financial pressure. For this reason, Axpo must once again make impairments on the value of its power plants and energy supply contracts. Meanwhile, business performance in the current financial year is positive.

Read more