Beznau nuclear power plant: Unit 1 back on grid after scheduled outage

22.05.2020 – The Beznau nuclear power plant (KKB) has completed refurbishment work on Unit 1 and reconnected the reactor to the grid today following the approval of the Swiss Federal Nuclear Safety Inspectorate (ENSI). It was possible to complete the work on schedule despite all the corona-related restrictions and additional efforts. 

The focus of refurbishment comprised maintenance work, recurring tests and inspections. In addition, integral system tests were carried out as usual. Of the 121 fuel assemblies, 20 were replaced with new elements and installed in the reactor core.

As usual during a restart, KKB will also conduct various, additional safety tests on Unit 1 and gradually take up full-load operation. The plant will be back to full load in three days.

During refurbishment the approx. 460 employees at KKB were supported by some 400 external specialists from the region, as well as from Switzerland and abroad. KKB implemented strict measures to prevent the spread of the corona-virus and to protect its own and external staff. Entrance checkpoints, strict adherence to hygiene and distancing rules, health check-ups, quarantine in suspected cases, split operation and home office proved to be effective. No corona-virus infections occurred.

At times, visible steam will be emitted from the non-nuclear section of the plant during the restart. This does not pose any danger to human beings or the environment.

All work was supervised by the Federal Nuclear Safety Inspectorate ENSI.

Axpo Holding AG

Corporate Communications

medien@axpo.com

T 0800 44 11 00 (Schweiz) 
T +41 56 200 41 10 (International)

(08.00 - 17.30)

More media releases

Show all

International business 26.11.2024

Axpo and Stegra sign 2 TWh electricity deal

Axpo Nordic and Stegra have signed a power purchase agreement (PPA) for the supply of electricity to Stegra’s integrated green hydrogen, green iron and green steel production plant in Boden, Sweden, it was announced today.

Read more

Renewable energy 20.11.2024

Axpo awarded 163 MW in French green energy tender

Axpo’s solar and wind divisions have successfully secured a combined capacity of 163 megawatts (MW) in two recent public tenders organised by the French government, it was announced today. The results reinforce Axpo’s position as a leading international producer of renewable energies, making a significant contribution to the expansion of climate-friendly electricity generation in Europe.

Read more

Nuclear energy 28.10.2024

Beznau nuclear power plant: Unit 1 back on the grid

Unit 1 of the Beznau nuclear power plant is back on the grid after being offline for several weeks. The investigations into the feedwater tank have been completed.

Read more